#43 Summary

Mud Creek Sediment Removal Project Silt Measurement Update by S. Grunder
Silt depths were determined on 3 previously designated sections of Mud Creek. (2 control #1 experimental). Each section consists of 6 consecutively numbered transects beginning at the upstream end. Silt measurements were taken along each transect at 1.5 feet (46 cm) intervals beginning 1.5 ft from south bank. Document shows results – no written analysis.